Part Number: 606737 / Vendor ID Number: 75 / Custom:
Pre-Bent S Curve MonoRail
pre-bent_s_curve_mo_156.jpg

Pre-Bent S Curve MonoRail

348
56
Pack Of: 1
WAS
$
536
25
Call for Availability
Qty
Product Specification
Dimensions
Height: 0.60"
Width: 0.30"
Product Overview
BROWN MO HORIZ. S-CURVE ANT.B
Product Availability
    Item is usually in stock, but we'll be in touch if there's a problem
Item Color 1:
Additional options that would change other selections
Master Color:
Additional options that would change other selections
Technical Details
Details
Category:
Track Ltg.
Subcategory:
Track Accessories
Finish:
Bronze /vendors/vendorImages bronze.jpg
Style:
Contemporary
Option:
Title 20
Category:
Monorail Hardware
Finish:
Antique Bronze
Style:
Contemporary | Modern
Option:
Dry Rated
Bulb Dimmable:
False
Introduction Date:
01/01/2005
Ship Carton Height:
6.00
Ship Weight:
3
Special Features:
From the brand formerly known as Tech Lighting
Vendor Ship Method:
UPS Fedex
Warranty:
1 Year
Weight:
1.10
24 Volt:
False
Adjustable Head:
False
Cable Field Cuttable:
True
Cannot Ship To California:
False
Cannot Ship To Canada:
False
Damp Rated:
False
Dark Sky:
False
Dry Rated:
False
FWC Compliant:
False
Integrated LED:
False
Item Color 1:
Brown
Master Color:
Brown
Motion Sensor Included:
False
Photocell Included:
False
Replaceable Lamp:
False
Reversible:
False
Safety Rating:
ETL
Shape:
Pre-bent S-curve
Sloped Ceiling Compatible:
False
Solar Powered:
False
SORAA:
False
Stocking Type:
Made to Order
System:
MonoRail
Title 20:
False
Title 24:
False
Transformer Required:
False
Warm Color Dimming:
FALSE
WET IP65:
False
Wet Rated:
False
To: From: Subject:

Timeless Designs Kitchen Bath & Lighting Gallery

Timeless Designs is a locally owned and operated business. We first opened our doors in February of 2004 and since then we still have not lost sight of our goal to provide Amarillo with the level of customer service they deserve when it comes time to choose lighting, plumbing, and appliances. Our staff has over 50 years of combined experience to help guide you in making your selections for your project.

Contact Us

Timeless Designs
1000 N. WESTERN
AMARILLO, TX 79106

Store Hours

M-F: 8am – 5pm
Sat: Closed
Sun: Closed
© 2022. Timeless Designs. All rights reserved. Powered by XOLogic.